9. Stage 3 expansion of the station:and building construction) (dobudowę to the existing) substations GIS 400 kV and secondary rooms in obmiarze that allows you to install and run target to 12 fields of substations GIS 400 kV for przyszej,(b)), in the new expansion of the building, 400 kV GIS substations at 8 fields(c)) the construction of the position for the unit 450 MVA and the installation of the AT3 400/110 kV together with the installation of zraszaczową,(d)) the construction of the cable connection between the 110 kV switching station AT3 an autotransformer and AT3 position,e) installation of 400 kV lines goals and track Kromolice Jasiniec tor I and II,(f) the construction of the new fields between the conductor rails) 400 kV switching station and position AT3 400/110 kV and 400 kV line gateway Kromolice tor and tor Jasiniec I and II,g) the construction of a water tank p secuirity. and the mains installation for AT3.10. implementation of the new grate the station ground robots.11. implementation of the land drainage, fences, roads, lighting and the rest of the infrastructure in the target system.12. To obtain the documents under the law of 14 December 2012 waste (OJ 2013 item 21) in view of the need to dispose of materials and waste arising in the course of work. Within the meaning of the aforementioned. the Bill, the Contractor becomes the manufacturer of the waste on the basis of article 3, point 22. In addition:(a)) the contractor meets the requirements imposed on the manufacturer of the waste contained in ww. The law, imposed by her dates(b) the Contractor shall submit to the appropriate Authorities to appropriate) evidence of compliance with the requirements of the law and the evidence of the transfer, recycling or disposal of the resulting waste work time in accordance with the legislation in force in this field,(c)), the contractor will be required to pay the amount obtained from the sale of Jsc PSE waste with market value, eg. scrap metals.13. Transfer to the contracting authority obtained the decision and cited. documents as attachments to the documentation.14. Programme implementation of the subject of the contract together with the understanding and obtaining the approval of the customer.15. Delivery of a set of required equipment, cameras and systems, structures and equipment, and other materials and accessories needed for the subject of the contract.16. The implementation of all civil and erection works, plumbing and in accordance with the draft regulations and the implementation of the programme to the extent required for the subject of the contract. The basic scope of work includes:17. Preparation of the construction site (temporary fences, power, etc.),18. Perform any other work and services related to the implementation of the subject of the contract, for example. disassemblies, disposal of equipment and materials, etc.19. implementation of technical tests, examinations, pomontażowych, measurements, examinations and tests of equipment and apparatus falling within the subject of the contract in accordance with the requirements of this PF.20. The execution of functional test devices and systems related to the subject of the contract and the development work.
正在翻譯中..
