2.1. General description of the subject of the contract is the subject of the contract
expansion station 400/220/110 kV Pątnów owned by Polish Power Grid S.A. in the following sections, it is the basic tasks to be carried out.
1. Conduct of social communication during the period of implementation of the subject of the contract.
2.The arrangements as procedural law is concerned to the extent necessary to comply with investment.
3. To obtain the necessary authorisations for the use of access roads, temporary seizure lanes, on-off power lines, telecommunications, gas, etc. , necessary for the realization of the investment for the duration of work (for both demolition,As well as building and assembly work) .
4. If you need to update or get a new decision on environmental considerations.
5. To perform the test ground investigations.
6. The building project expansion station 400/220/110 kV Pątnów Contracting together with obtaining opinion.
7. A final decision to permit the construction of the station.
8.A decision to fix location of the investments for the public (ULICP) for the range of tangible.
9. Development projects implementing the modernisation, together with obtaining opinion entity.
10. Preparation of site and facilities.
11. Purchase, delivery,Storage and transport to the site materials needed for expansion and modernisation and reconstruction station line.
12. Make required arrangements and claims of the work to the competent administrative bodies and surveillance units construction.
13. The expansion station 400/220/110 kV Pątnów.
14.Full co-operation with contractors contracting with any necessary arrangements for installation and deployment in power (KDM and the ODMS), in surveillance centers operating and RCN (CN) .
15. To perform the necessary installation and deployment in stations and related facilities,In this work related to the implementation of the 400 kV relationship between Kromolice-Pątnów to SE between Kromolice related to primary circuit connection and starting ww. relationship.
16. The compensation payments or repairing damage caused during building and assembly work or demolition.
THE PROGRAM FUNKCJONALNO-productive
Expansion station 400/220/110 kV Pątnów
Page 6 of 155
17.The carrying out of tests and acceptance tests installed devices, apparatus and systems.
18. The final acceptance, in this voltage testing and stress.
19. Development of as built drawings.
20. To develop and agree on operating manual station.
21. Obtain permission to use the.
22. To start and run installed devices,Systems and installations in the 400/220/110 kV overhead line Pątnów and at the second ends 400 and 110 kV.
23. Disposal of materials and equipment not subject to re-flush.
24. The completion of the work and get all the required arrangements and licenses.