The delivery of any materials including construction, wiring, insulation, apparatus, etc.Installation fittings (3pcs) 110kV cable pillars including: installation of construction, installation of izolatorowych chains and cables (overhead connection between existing pillars, the marginal, and the nowoprojektowanymi cable posts)Assembly of the structure under the surge 110kV-4 statusInstallation stops przepięć110kV-4stanInstallation of construction supporting structures of cable head-4stan.Implementation 4 110kV cable systems:
正在翻譯中..
