2.3.10. technical protection System-SOTThe contractor shall be obliged to supply, install and run the security system (SOT) for 400/220/110 kV Pątnów-provide for the possible use of existing elements. Within the framework of the tasks of the contractor will also cooperate with SOT SSiN in accordance with the principles set out in the standards of PSE SA, including the standard letter signals. Please review a list of the signals for SSiN from the scope of the SOT on the customer and their editing in SSiN station.Locally you should implement interactions between exchanges to raise security level SOT object, with which required fire alarm level II must result in turning off fans and air conditioners at, and locks in the aisles.It should also be ensured and start transmitting signals to station SSiN and parent systems at CN and RCN. The ICT network infrastructure forming segment SOT should be associated redundantnie (two optical connections) to the central LAN switches. In this way, IP communication will be ensured to SSiN in the and by the local node (WAN) to the parent systems at CN and RCN. For the purposes of the transmission of data via the WAN application optimization should be provided for the use of bandwidth. It is required to agree with the customer to connect elements of the SOT for network infrastructure (LAN switches in particular) and understanding IP addressing.It is necessary to ensure the integration of hardware and software in all the station at technical security systems, without prejudice to the autonomy of integrated systems.In the field of services related to the implementation of the SOT, the company will be obliged to carry out periodic reviews for the duration of the guarantee in respect to the behavior of the warranty conditions.System of protection of station, Support must be compatible with "Standard technical security engineering PSE S.A.", "technical specification-power station fences" and the "guidelines for the organisation of the protection of power facilities PSE S.A.".This specification is consistent with the provisions of the Polish law and the EU, according to the recommendations adopted in the EU, the European Programme for Critical Infrastructure Protection (EPCIP). The station 400/220/110 kV Pątnów is considered critical infrastructure PSE Sa, and therefore must meet the requirements set out in the above cited documents.For CCTV system connection is required made fiber cable. Details to be arranged on the stage of the project.Table 2. Guidelines for technical security of the station
正在翻譯中..