2.1. General description of the subject of the contractThe subject of the contract is to implement the expansion of the station 400/220/110 kV Pątnów owned Polish electricity networks S.A. in the following paragraphs are a basic range of tasks to be performed.1. Carrying communication activities throughout the course of the contract.2. Carrying out the formalnoprawnych arrangements to the extent necessary for the implementation of the investment.3. obtaining the necessary authorisations for the use of roads, the temporary seizure of lanes, to the exclusion of power lines, telecommunications, gas, etc., necessary for the implementation of the investment for the duration of the works (applies to both demolition and construction work-Assembly).4. If necessary, update or obtain a new environmental decision considerations.5. execution of geotechnical studies.6. implementation of the construction project the expansion of power station 400/220/110 kV Pątnów, along with obtaining the opinion of the contracting authority.7. To obtain the final decisions about the construction licence for the station.8. Getting the decision to establish the location of the investments to the public (ULICP) for the stated scope of in rem.9. development of projects implementing the modernisation of the station along with obtaining the opinion of the contracting authority.10. Preparation of the construction site and backend.11. The purchase, delivery, storage and transportation to the job site with the necessary materials for the expansion and modernisation of stations and reconstruction of the line.12. Make the required arrangements and work reports to the competent organs of administration and construction supervision units.13. implementation of the expansion of the station 400/220/110 kV Pątnów.14. The contractor's full cooperation with the customer when necessary Assembly work and development in the dispositions (KDM and ODM), operational surveillance centres (CN and RCN).15. implementation of the necessary Assembly work stations and related facilities in boot and including work related with the introduction of the 400 kV line relationship Kromolice-Pątnów to SE connection-related primary circuits Kromolice and running. the relationship.16. Payment of compensation or damages arising in the course of the work of civil and erection works, or demolition.PROGRAM FUNCTIONAL PREMISESExpansion of the power station 400/220/110 kV PątnówPage 6 of 15517. Carry out a test reception equipment, installed apparatus and systems.18. Carry out a final receipt, including voltage and load tests.19. The development of the engineering documentation.20. The elaboration and agreement of the manual operation of the station.21. To obtain licences for the use of the station.22. to boot and run the installed equipment, systems and installations in the 400/220/110 kV Pątnów and the second end of the overhead lines 400 and 110 kV.23. Disposal of materials and equipment not subject to re-building.24. Reporting the completion of the work and getting all the required arrangements and licences.
正在翻譯中..
